Supply & Installation of HV System
Projects Website Banner11

Project Brief

This Project is aimed at designing, supplying and Installing High Voltage Power Connection for the entire Plant. It includes the supply and Installation of 4 Set Ring Main Unit (HV Switchgear) complete with a Landis Relay, installation and commissioning of a 2MVA Transformer as well as the supply and Installation of the main HV Cable from the HV Switchgear to the Transformer. Entire system is tested, commissioned and handed over to client after Installations.

Scope of Work

The scope of work included the Design, Supply and Installation of Ring main unit, Metering Panel, HV Cable and HV termination accessories. Factory Acceptance Test and Site Acceptance Test was conducted with the client before commencement of work.  Prior to project closure, commissioning works and Training was conducted and handed over project to client.

Other Projects

Projects-Website-Banner1a
COCA COLA - DESIGN, SUPPLY & INSTALLATION OF THREE INPUT 4000A SYNCHRONISING PANEL
The objective of the project was to upgrade the main switch board (utility panel) consisting of 2 No. utility sources, 3 No. Diesel generators.
Projects-Website-Banner2
DESIGN, MANUFACTURING SUPPLY & INSTALLATION WORKS FOR GHANA ELECTRICAL PROJECT
This Project was aimed at design, manufacturing, supply and Installation works for Ghana Electrical Project for fertilizer Manufacturing Plant -Tema.
Projects-Website-Banner8
LINCOLN COMMUNITY SCHOOL - SOLAR PROJECT
The system consists of the mounting & installation of solar modules on both flat roofs & rooftops which demand very meticulous adherence to high safety standards to avert injury & damage to equipment.
Projects-Website-Banner9
DVLA TEMA REGIONAL OFFICE - SOLAR PROJECT
Process and Plant Automation Limited won a tender issued by the Driver and Vehicle Licensing to undertake a pilot solar PV power system installation at its Tema Regional Office.
Projects-Website-Banner10
ATWEA MOUNTAINS PRAYER CAMP - SOLAR PROJECT
We undertook the installation of a 22.32kWp Off-Grid Solar PV Power System at the Atwea Mountains Prayer Camp.
Projects-Website-Banner-Wilmer
WILMAR - INTEGRATION & AUTOMATION OF VYNCKE BOILER
In June 2016, Process and Plant Automation was engaged on a project for Ghana Specialty Fats Limited - a Wimar Company for Integration and Automation of Boiler System.
New-Website-Banner-Juabeng-Oil
JUABEN OIL MILLS - PLANT PRODUCTION MASS BALANCE
On the 6th of July 2018 Automation Solution Limited (ASL) commenced a project on Energy Metering Solution at Juaben Oil Mills Limited.
Projects-Website-Banner12a
NCA Towers - SMART METERING
The aim of the smart metering project at the NCA towers was to provide an all inclusive and accurate system for billing tenants and all other users of the building based on their respective energy consumption.
Projects-Website-Banner
Building Management System - THE BANK HOSPITAL
The Building Management System (BMS) provides an all-in-one information and control centre for all critical load and equipment in the building.
New-Website-Banner-Premium
ELECTRICAL INSTALLATION WORKS FOR PREMIUM FOODS
The factory is located at Kwaso in the Ashanti region of Ghana. It is a grain storage and processing facility that is capable of storing 16800 tons of grain including rice, maize, wheat and soyabeans.