PUMA Energy - 110 MW Thermal Power Plant
Projects Website Banner4

Project Brief

On May 24, 2018 the electrical installation and commissioning of the 107 Megawatts combined power cycle plant for Ghana Power Generation Company Limited began. The Plant consisted of 2 gas generators with the excess heat fuelling a boiler for steam production. steam produced is supplied to 2 steam generators for additional power generation. Process and plant automation limited did the plant electrical installation as well as the commissioning.

Scope of Work

  1. Testing of Electrical panels
  2. Laying of Cable trays
  3. Routing of Cables
  4. Engineering (Cable Callout, Cable Block Diagram)
  5. Instrumentation
  6. Cable Terminations (Low Voltage Cables and Medium Voltage Cables)
  7. Testing and Commissioning

Other Projects

Projects-Website-Banner1a
COCA COLA - DESIGN, SUPPLY & INSTALLATION OF THREE INPUT 4000A SYNCHRONISING PANEL
The objective of the project was to upgrade the main switch board (utility panel) consisting of 2 No. utility sources, 3 No. Diesel generators.
Projects-Website-Banner2
DESIGN, MANUFACTURING SUPPLY & INSTALLATION WORKS FOR GHANA ELECTRICAL PROJECT
This Project was aimed at design, manufacturing, supply and Installation works for Ghana Electrical Project for fertilizer Manufacturing Plant -Tema.
Projects-Website-Banner8
LINCOLN COMMUNITY SCHOOL - SOLAR PROJECT
The system consists of the mounting & installation of solar modules on both flat roofs & rooftops which demand very meticulous adherence to high safety standards to avert injury & damage to equipment.
Projects-Website-Banner9
DVLA TEMA REGIONAL OFFICE - SOLAR PROJECT
Process and Plant Automation Limited won a tender issued by the Driver and Vehicle Licensing to undertake a pilot solar PV power system installation at its Tema Regional Office.
Projects-Website-Banner10
ATWEA MOUNTAINS PRAYER CAMP - SOLAR PROJECT
We undertook the installation of a 22.32kWp Off-Grid Solar PV Power System at the Atwea Mountains Prayer Camp.
Projects-Website-Banner-Wilmer
WILMAR - INTEGRATION & AUTOMATION OF VYNCKE BOILER
In June 2016, Process and Plant Automation was engaged on a project for Ghana Specialty Fats Limited - a Wimar Company for Integration and Automation of Boiler System.
New-Website-Banner-Juabeng-Oil
JUABEN OIL MILLS - PLANT PRODUCTION MASS BALANCE
On the 6th of July 2018 Automation Solution Limited (ASL) commenced a project on Energy Metering Solution at Juaben Oil Mills Limited.
Projects-Website-Banner12a
NCA Towers - SMART METERING
The aim of the smart metering project at the NCA towers was to provide an all inclusive and accurate system for billing tenants and all other users of the building based on their respective energy consumption.
Projects-Website-Banner
Building Management System - THE BANK HOSPITAL
The Building Management System (BMS) provides an all-in-one information and control centre for all critical load and equipment in the building.
New-Website-Banner-Premium
ELECTRICAL INSTALLATION WORKS FOR PREMIUM FOODS
The factory is located at Kwaso in the Ashanti region of Ghana. It is a grain storage and processing facility that is capable of storing 16800 tons of grain including rice, maize, wheat and soyabeans.