DESIGN, MANUFACTURING SUPPLY & INSTALLATION WORKS FOR GHANA ELECTRICAL PROJECT

PROJECT BRIEF
In June 2017, PPA and YARA met to discuss project implementation plan for their new production facility in Tema. After discussions and design works, PPA received the contract to commence work in February 2018. This Project was aimed at design, manufacturing, supply and Installation works for Ghana Electrical Project for fertilizer Manufacturing Plant -Tema. It included the supply and installation of hardware such as MLV Panels, Automatic Transfer Switches, Power Factor Correction Panel, Earthing works, Transformer and Metering panel as well as supply and installation of Cable trays, Cables, Lights and Emergency System. The entire system was tested, commission and project document including as built drawings was handed over to client.

SCOPE OF WORK

  1. Installations of cable trays
  2. Installation of Distribution Boards, AVR and other control panels
  3. Earthing systems
  4. Running of cables of various sizes
  5. Installation of sockets and lighting luminaries
  6. Office wiring