On May 24, 2018 the electrical installation and commissioning of the 107 Megawatts combined power cycle plant for Ghana Power Generation Company Limited began. The Plant consisted of 2 gas generators with the excess heat fuelling a boiler for steam production. steam produced is supplied to 2 steam generators for additional power generation. Process and plant automation limited did the plant electrical installation as well as the commissioning.